Techniques lifted from the shipped CSS of Linear, Raycast, Resend, Attio and Liveblocks: two
off-axis coloured lights instead of one centred blob, a five-layer graduated penumbra, a four-part inset edge,
sparse SVG grain at overlay blend, an edge-masked dot grid, and one element per shot lifted out of the plane
on frosted glass with its own specular highlight.
01 — Customer portals
Dribbble register · glass, orb glow, 40px display type
Same portal, designed rather than specified
NNorthgate
HomeShopOrdersInvoices
Reorder
DR
On the truck, arriving Thursday.
Everything you buy, tracked and one tap from reordering.
Track orderBrowse catalogue
Latest order
SO-10428
Arriving Thu 14 Aug · before 5pm
OrderedPackedOn the truckDelivered
Buy it againSee all 42
1/2 in galv. elbowNG-4471-EL12
$3.85Add
Loctite 243NG-2210-LT243
$18.40Add
3M 2090 tapeNG-8802-3M90
$9.20Add
Out for delivery
Loomis 1Z44A9X · before 5pm Thursday
02 — Dashboards and internal tools
Space Grotesk · industrial amber · amber key, ember fill
Ridgeline Fabrication, metal fab
Output this shift
1,284+6.4%
Past due
4
2 at Press 2
Utilisation
87%
Hours by cell
Weld A
7.0
Press 2
5.7
Finish
4.3
Brake
2.6
Activity
WO-8841 flagged past due · Press 2
WO-8852 closed by M. Kaur · 14:02
Stock check raised on plate 3/8 in
On-time delivery · last 14 days
Press 2 running behind
WO-8841 · 3h 20m over standard
03 — APIs and integrations
IBM Plex · dev-tool violet · violet key, cyan fill
Conduit, integration tooling
conduit.run/flows/erp-to-books
ODOdoo ERP
sale.order
SHShopify
orders/create
FXTransform
map · dedupe · tax
QBQuickBooks
create invoice
WHWarehouse
reserve stock
14:02:11sale.order 10428QB invoice 8841 created
14:02:11sale.order 104284 lines reserved
14:02:09shopify 5512matched existing customer
—348 records this run · 0 errors · next in 12 min
Run complete
348 records · 0 errors · 1.9s
04 — Bespoke business applications
Source Serif 4 · teal on paper · teal key, warm fill
Copper Creek Coatings, industrial finishing
C
Copper Creek CoatingsINDUSTRIAL & COMMERCIAL FINISHING
Q-2291Issued 12 Aug 2026 Valid 30 days
Prepared for
Trenton Industrial Park Building C, 4,200 sq ft deck Attn: R. Whitfield
Rules the system applied
Union rate schedule 2026-B Height surcharge over 20 ft Winter cure, +3 days
Description
Qty
Rate
Amount
Surface prep, abrasive blast
4,200
$1.85
$7,770.00
Epoxy primer, two coat
4,200
$2.40
$10,080.00
Urethane topcoat
4,200
$3.10
$13,020.00
Containment and access
1
$4,600.00
$4,600.00
Subtotal$35,470.00
Height surcharge (5%)$1,773.50
Total$37,243.50
R. Whitfield
Client signature · 12 Aug 2026
Copper Creek representative
Signed and returned
R. Whitfield · 12 Aug, 4:18pm
05 — MVP development
Plus Jakarta Sans · indigo on white · indigo key, emerald fill
Shiftly, shift work
9:415G
Pick your site
One step, then you are in
Riverside12 km away
Selected
Eastgate28 km away
Continue
9:415G
Open shifts
Riverside · this week
Thu 06:00–14:00Loader operator
Open
Fri 14:00–22:00Yard hand
Open
Sat 06:00–14:00Loader operator
2 bids
Claim shift
v1.0 shipped 12 Aug
One feature. 340 shifts claimed since.
06 — White-label software
DM Sans · neutral slate shell · orange key, cyan fill